Leatt - 1.0 Flat Shoes

Leatt - 1.0 Flat Shoes

$ 45.17

$ 58.72

Save: $

Color:
  • Skull
  • Black
Size:
  • US8
  • US8.5
  • US9
  • US9.5
  • US10
  • US10.5
  • US11
  • US12
  • US13
  • US7
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

CASUAL EVERY DAY ALL DAY

The casual synthetic suede sneaker with the heart of a riding shoe

The all new Leatt 1.0 shoe is a casual, everyday sneaker with great pedal compatibility and comfort. It features a durable upper synthetic suede material with a softer sole than most riding shoes, which makes them comfortable all-day shoes.
Be prepared to ride, anytime, anywhere!

  • RideGrip™ compound for even better grip
  • Comfortable sneaker sole with great pedal compatibility: 
    • Dual compound sole with stiffened insert for pedal support
  • Durable shoe upper: 
    • Synthetic Suede with perforations for breathability
  • Solid Midsole: 
    • Anti-compression midsole for comfort 
    • Active Carbon moisture wicking, quick dry, anti-bacteria, anti-odor material
  • Size: US 6-13, UK 5.5-12.5, EU 38.5-48.5, CM 24-31

              You May Also Like

              Cloud 5 Mesh Women's Lace Up Trainers - UK 7 - US 9 Women - EU 40.5
              Cloud 5 Mesh Women's Lace Up Trainers - UK 7 - US 9 Women - EU 40.5

              $ 54.97

              $ 190.00

              Lae‘ahi Lauhala - Trench Blue
              Lae‘ahi Lauhala - Trench Blue

              $ 40.05

              $ 154.34

              Ba&sh Katie Embroidered Top Green
              Ba&sh Katie Embroidered Top Green

              $ 67.62

              $ 128.63

              New  Men , Women Hollow Mesh Lightweight Road Running Sneakers
              New Men , Women Hollow Mesh Lightweight Road Running Sneakers

              $ 43.76

              $ 175.00

              Craftsman 3/8 in. drive Metric 6 Point Deep Socket Set Deep Impact Socket Set 9 pc
              Craftsman 3/8 in. drive Metric 6 Point Deep Socket Set Deep Impact Socket Set 9 pc

              $ 81.25

              $ 134.97

              Clarks Sandals EU23
              Clarks Sandals EU23

              $ 80.00

              $ 178.73

              The Cool Polo | Dark Colours | Short Sleeve | Adults
              The Cool Polo | Dark Colours | Short Sleeve | Adults

              $ 31.74

              $ 154.00

              Wild Walker Vegan Suede Straps | Red
              Wild Walker Vegan Suede Straps | Red

              $ 43.00

              $ 154.00

              Brown Blanket Emboss Ariat Hilo
              Brown Blanket Emboss Ariat Hilo

              $ 79.95

              $ 145.21

              Desert Camouflage Unisex Lightweight Sneaker S-1 Boost
              Desert Camouflage Unisex Lightweight Sneaker S-1 Boost

              $ 79.95

              $ 132.87

              Cart
              Ultimate Footwear Guide
              Your cart is currently empty.